LNG Terminal in Pori

Finland’s first LNG terminal opened in 2016 at the Vetenskär oil and chemical port in Pori.

We worked closely in the final stage of the project, via the terminal’s heating and frost-protection solutions. In collaboration with the building contractor, we planned and supplied a great deal, in accordance with both the terminal’s specific needs and the strict requirements of the industry. 

Our heating solutions at the LNG terminal include tracing along the pipework. The tracing system contains our heating cables, thermostats, distribution boxes and transducers. We also supplied heaters for containers and vats, as frost protection for liquids. Work safety on ramps and walkways was assured by snow and ice-melting cables.